The candidate passed. The upgrade did not.

A release candidate passed every gate and failed on contact with production six minutes later. The gates proved compatibility with the target database state; nothing had proved the transition from the state actually running.

Release engineering / Published Aug 3, 2026 / Revised Aug 8, 2026

Vuoro
The public label for this family of small, separately owned agent-workflow tools.

Explore this note with AI

Apply and challenge it in your own context.

A post-hoc prompt for applying and extending this note. It is not a reconstruction of how the note was written.

Use this note as one worked instantiation, not a rule to copy. The transferable question: when a release qualification suite passes every gate and the release still fails on contact with production, what class of claim did the suite never make? This instantiation concludes that compatibility-with-destination and admissibility-of-the-transition-from- the-actual-current-state are separate claims, that disposable-database fixtures silently encode an assumed starting schema version instead of the one production is actually running, and that the fix is a state-transition contract (S0 through R0) where the untested edge -- not the destination -- is where fixtures must be built. Its constraints are a system with staged, numbered schema migrations, a runtime that fails closed rather than discovering mismatch mid-transaction, and a cheap image-only rollback because no persistent state had changed yet. Apply the question to your own release pipeline. Name where your constraints diverge -- unversioned schemas, migrations that run automatically rather than being staged separately, rollbacks that are not cheap -- and say which parts of this method still transfer. Produce the state-transition diagram for your own release edges and name which arrow currently has no test.

On this page

At 22:36 UTC on 2026-08-02, I pinned Vuoro v0.1.33 into both containers of the vuoro-shared deployment. Six minutes later I merged the rollback.

The new pod had failed at startup:

CompositionError: runtime compatibility failed for: work, execution

The old pod stayed 2/2 Ready and continued serving. The rollback restored digest sha256:9c1d0e53.... Replicas, jobs, sentinels, backups, schemas, and producers did not change, and no database migration ran.

The containment worked. The release qualification did not.

What had passed

The rejected image was digest sha256:b980c34e.... Before deployment it had passed:

  • image-alias checks;
  • maximum SLSA provenance, SPDX SBOM, and GitHub attestation verification against the exact source and tag;
  • the producer, session, and claim gate;
  • full validation and both root and focused Kustomize renders;
  • the preflight harness, a client dry-run, the SOPS commit hook, and exact static assertions; and
  • independent review.

The pull request also limited itself to changing the image pin. It did not claim to migrate schemas, resume producers, replace sentinels, or alter replicas.

All of that evidence was valid. It answered the wrong release question.

The state the tests had skipped

The candidate had been tested with disposable databases already constructed at schema version 6. Production still had work schema 5 and execution schema 3. Nothing in the gate named that starting point.

The image was compatible with the state expected after migration. The upgrade needed it to start before that migration was complete. The difference only became visible when the real pod met the real ledgers.

The runtime then did what it was meant to do. It refused to serve against unsupported schemas instead of discovering the mismatch during a transaction. The deployment kept the old pod available, and the image-only rollback remained cheap because no persistent state had changed.

Testing the move

The replacement qualification used the exact adapter releases shipped in the image and created every database fixture inside that image. It exercised four states:

State Expected Result
work 5 + staged maintenance bridge, execution 3 ready, no DDL pass
the same state after restart ready, no DDL pass
work 6 + execution 6, capability marker granted ready pass
work 6 without the marker grant fails closed pass

The first row reproduces the production starting point. The second catches software that performs hidden work only on first start. The last row fails with InsufficientPrivilege: permission denied for table sprintctl_schema_capability. That failure established a migration requirement: grant SELECT on the capability table in the same transaction that creates it.

The four-state matrix was then run against the published digest, rather than only a local build. When a later adapter release changed which clock governed capability transitions, the same matrix was run again against the repinned image.

The release contract now names the edges

S0  live starting state          work 5, execution 3, no staged bridge
S1  additive bridge staged       maintenance relations present, no DDL on start
S2  new image deployed           runs against S1, restart-stable
R1  image rollback at S1         prior digest, bridge left in place
R0  bridge rollback              only where proven additive and reversible

Each arrow needs a test. In particular, deploying the new image at S1, restarting it at S1, and returning to the old image at S1 are separate claims. The additive bridge makes the image rollback possible without first undoing the schema change.

The original tests proved the candidate worked at the destination. They never proved it could leave the state production was actually in.

Still open (as of 2026-08-08)

The maintenance bridge is staged, but the cutover is not complete. The failing permission test has specified the required grant, but that grant has not yet been applied to the live ledgers. The transition has been proved state by state in disposable databases; it has not yet been walked end to end in production.

That unfinished walk is the next release gate.